Neighborhood Sidewalk Program (NSP)
Program Summary
Subject to the availability of funds in the City Budget, the Neighborhood Sidewalk Program (NSP) is intended to be used for small scale multi-modal projects within neighborhoods, including sidewalks and multi-use trails.  It is recommended (but not required) that installation costs for Neighborhood Sidewalk Program projects be shared between the City and the neighborhood.

"Call For Projects" period
The City of Spring Hill is pleased to announce a "Call for Projects" for 2017/2018 budget year funding of the Neighborhood Sidewalk Program.  Sidewalk projects will be installed in the 2017/2018 budget year which begins July 1, 2017.  The City will receive requests from interested neighborhoods, or citizen groups for projects until the deadline of Friday, September 30, 2016 at 4:00 PM. 

Link: NSP Project Request Form

For questions please contact the Project Manager Missy Stahl.

Completed Project Request Forms can be dropped off at City Hall to the attention of Missy Stahl.

Program Resources
The main criteria and goals of the Neighborhood Sidewalk Program are to provide:
  • Improved safety
  • Improved pedestrian mobility
  • Improved connectivity to schools
  • Improved connectivity to park and recreation facilities
  • Improved connectivity between multiple land uses
  • Improved connectivity to Transit options
  • Partnership with neighborhoods to complete projects

Link:  Spring Hill Neighborhood Sidewalk Program (NSP)
Link:  NSP Project Request Form
Link:  NSP Project Petition Form

The NSP is administered by City Staff and is subject to availability of funds in the City Budget and final approval by the Board of Mayor and Aldermen.  City Staff will periodically advertise a "Call for Projects", a period of time when requests for projects may be submitted.  

Requests that are submitted will be evaluated and scored on the following criteria for justification:

Safety Factors
Trip Generation Factors (proximity to Schools, Parks and other Civic facilities)
Land Use (Zoning) Factors
Constructability, Location and Other Factors
Neighborhood Cost Share Amount

Link:  NSP Project Scoring Criteria Worksheet

Final determination will be based on a variety of factors including justification, funding availability and Board of Mayor and Aldermen Approval.

External Link:  Calculator to Estimate the Cost to Install Concrete Sidewalk
External Link:  Calculator to Estimate the Cost to Install Paved Walking Trail

Note:  To calculate the square feet for a sidewalk project, multiply the Length of the project by 5 feet, the minimum width of any sidewalk per Spring Hill Subdivision Regulations.  For Paved Walking Trails, use 5 feet (minimum for walkway), 6 feet (recommended for walkway or one way bike trail) or 8 feet (minimum for 2 way bike trail).  A Homeowners’ Association, Neighborhood Group, or an Individual making the request will need to assist the City in obtaining the necessary easements or Right-Of-Ways that are required for the Project.  Mail box relocation, if required by the final design, will be a homeowner responsibility.